Introduction:-
Australia's Queensland State Government in 2006 established a design brief on a pedestrian bridge with low budget hardly possible in state capital, Brisbane to establish link with Queensland Gallery of Modern Art (GoMA). Baulderstone(contractor), Arup(engineer) and Cox Rayner(architect) won the design competition with a design, fusion of art and science having array of masts, cables and flying steel spars well suited with locality, structurally efficient and completely original. More on “tensegrity”.
Key statistics
Ø  Bridge deck 430m long x 6.5m clear width between handrails
Ø  500m3 of concrete and 500 tonnes of steel
Ø  Nearly 7km of high strength steel cables

Why “tensegrity” Bridge?




All the possible solution in front of the team and why there were discarded is shown below:-
Restrictions:- Clearance and remote access.

OPTION
HINDERANCE
DECISION
Cable-stayed
Large mast Visually Dominant
No
Arch
Poor soil condition
No
Suspension
Poor soil condition
No
Tube
Promising but difficult to construct
No
Tensegrity mast-and-cable
Satisfies all aspect
Yes

Superstructure form and details

Ø  3 main sections separated from central by expansion joint and bearings:-
1.      Point approach(120m)
2.      Tensegrity itself(3 spans of 58m, 128m and 45m)
3.      Tank street approach(82m)
Ø  Mainly used composite steel (masts, cables, ties, tensegrity canopy) and concrete for deck structure.
Ø  Tensegrity bridge elements:-
1.     Masts:- fabricated tubular steel sections up to 30m long with section 610-905mm diameter.
2.      Major mast cables:- high-strength spiral wound galvanized wire ropes 30-80mm diameter.
3.      Spars:- circular hollow sections up to 23m long with section sizes 457-508mm diameter.
4.      Spar cables:- high-strength stainless steel spiral wound cables 19-32mm diameter.
Ø  Precast deck panels were used which were stitched by in situ concreting.
Ø  Edge Beams separated from deck has fabricated box sections having curved outer face for aerodynamic stability.
Ø  Pairs of major raking tubular steel masts spring from the main support piers on either sides of the main span, setting the locations of an approximately coplanar array of minor secondary masts. The major and minor masts are offsets from the perpendicular both longitudinally and transversely, thus preventing cable/mast or cable/cable clashes and providing the signature “Randomness” without much reducing structural efficiency. Secondary cables connected to flying struts, themselves pure tensegrity elements (only supported by cables), provide lateral restraint to the masts.
Ø  The tensegrity array of flying struts and cables that hovers above and beside the deck fulfils three critical functions:
1.      It laterally restrains the tops of all the masts, preventing them from buckling sideways under the loads arising from the suspension of the deck plus lateral and seismic forces.
2.      It suspends the canopy, allowing it to float above the deck with no apparent means of support.
3.      It laterally restrains the tops of all the masts, preventing them from buckling sideways under the loads arising from suspension of the deck plus lateral and seismic forces.
4.      It works in unison with all the masts and cables to resist twisting and lateral forces arising from patch loads on the deck (i.e. crowds), wind and earthquakes.

Comments

  1. Definitely imagine that that you said. Your favorite reason appeared to be at the net the
    simplest thing to have in mind of. I say to you,
    I certainly get irked at the same time as other folks think about issues that
    they plainly do not know about. You controlled to hit the nail upon the top aand also outlined out
    thee whole thing with no need side effect , other folks
    can take a signal. Will probably be again to gett more.
    Thank you

    Feel free to visit myy web site - like this

    ReplyDelete

Post a Comment

Popular posts from this blog

Top 10 most impressive civil engineering projects of all time

*Source Norwich University

Mars: will soon house humans

Ad There's been a lot of discussion on question "Are we Martians?". The question is still to be answered. But now there seems no more doubt on "Is Mars our future home?", the answer is "YES". A 3-D product designer Noah Hershberger, who won a recent challenge from NASA 's Jet Propulsion Laboratory and Makerbot to design a bio-shielding dwelling for the red planet.  The current environment of Mars doesn't welcome human habitation even construction over there would have been an impossible task( to withstand -80 degree temperatures, constant space radiation, and frequent dust storms) but not now in the light of recent development in 3-D printing. They are seeking to use locally available Mar dust and binder to print the elegant Beehive like apartment plan proposed by Noah Hershberger.   Below are some key features and issued images of a Two bed room apartment of future on Mars.  The apartment includes  a garden and a  3-D printer  room.  To keep...

Bridge projects with varied level of bioinspiration

Ad 1. Campo Vo-lantin Bridge 2. Foldable Bridge 3. Butterfly Bridge 4. Nesenbach Valley Bridge  5. Millennium Bridge 6. Ribble Way Bridge 7. Webb Bridge 8. Rolling Bridge 9. Dragon Bridge  10. Chords Bridge 11. Henderson Bridge 12. Double Helix Bridge(Along with our partially completed prototype in CESS exibition) 13. Chunhua footbridge 14. Peace Bridge  15. Dragon Eco Bridge Details on these is below:-